Basic Interpretation
Context Description
-
- Mid 19th century dump deposit. Levelling and ground raising after construction of railway viaduct (14). Top of deposit has 10 mm thick mortar trample surface on it (at interface with 6). This is probably a working surface of trample associated with levelling activity.
-
- Dan Eddisford
- 15-8-2012
Finds
Record Details
- Dan Eddisford 15-8-2012
-
- Dan Eddisford
- - -
Plan
-
Plan: MNO12_2
- Multi context plan GP1
Context Register Text
- Dump layer
Location
Subgroup
-
Subgroup: MNO12_231
- Levelling deposits, post viaduct
- 4: PM2 1760-1960
Plan
Samples
- No records attached.