Basic Interpretation
Context Description
-
- Large truncation event associated with the construction of the railway viaduct and Fenchurch st station. Recorded in geotechnical pit. Visible in plan and in the west facing section. Cuts earlier barrell vault (14). This is then rebuilt as (9) and cut filled with loose rubble deposits (6) and (7), raising ground level to close to present day level.
-
- Dan Eddisford
- 15-8-2012
Finds
Record Details
- Dan Eddisford 15-8-2012
-
- Dan Eddisford
- - -
Plan
-
Plan: MNO12_2
- Multi context plan GP1
Context Register Text
- Construction cut for barrel vault rebuild and railway viaduct
Location
Subgroup
-
Subgroup: MNO12_228
- Rebuild of north end of barrel vault after viaduct built
- 4: PM2 1760-1960
Plan
Samples
- No records attached.