Subgroup Register Text
- Vertical timber pile
Phase
Subgroup Narrative
-
- Vertical timber pile
-
- Chiz Harward
- 8-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3062 | ST - Structural Timber | C | Post through redeposited sand, original construction level lost |