v1.2
100 Minories
Guest UserHelpLogout
100 Minories

Subgroup Register Text

  • revetment of causeway

Subgroup Narrative

    • E-W causeway southern revetment; timber stakes with horizontal planks
      • Chiz Harward
    • 10-6-2016

Contexts

ContextBasic Interp.Basic ProcessContext Description
MNO12_2754 ST - Structural Timber CU Western most wooden post in southern revetment that holds up deposit (2742).
MNO12_2771 ST - Structural Timber CU Timber plank in south side of revetment.
MNO12_2772 ST - Structural Timber CU Timber plank in south side of revetment.
MNO12_2760 ST - Structural Timber CU Timber plank. Part of revetment holding back (2742).
MNO12_2757 ST - Structural Timber CU Eastern most wooden post in southern revetment that holds up deposit (2742).
MNO12_2755 ST - Structural Timber CU Central Western wooden post in southern revetment that holds up deposit (2742).
MNO12_2761 SP - Structural Cut (Post-hole) C Brick packing at the base of stake 2755
MNO12_2756 ST - Structural Timber CU Central Eastern wooden post in southern revetment that holds up deposit (2742).
MNO12_2753 ST - Structural Timber CU Timber stake, part of NS revetment. Same as 2765
MNO12_2765 ST - Structural Timber CU Stake in N/S revetment
MNO12_2766 ST - Structural Timber CU Stake in N/S revetment
MNO12_2751 ST - Structural Timber CU Timber in ditch, N-S planks, possibly ex situ but largely where would be placed in revetment