Subgroup Register Text
- Levelling dumps below floor
Phase
Subgroup Narrative
-
- Levelling dumps below brick floor, not clear if levelling up for floor, there is a thin trample layer over the levelling dump
-
- Chiz Harward
- 14-11-2017
Subgroup Matrix
-
- [not set]
- [not set]
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_4603 | MU - Make-up, Levelling | C | Levelling layer |
MNO12_4602 | OC - Occupation Debris | CU | trampled soil and gravel layer |