Subgroup Register Text
- Brick wall and levelling dumps
Phase
Subgroup Narrative
-
- Brick wall built within wider cut; with construction backfill/levelling deposits.
-
- Chiz Harward
- 29-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_1228 | S - Structural Cut | C | Cut for slumped brick and tile floor 1181 and brick wall 1152 |
MNO12_1152 | WA - Wall, Sill | CU | north-south brick wall |
MNO12_1242 | MU - Make-up, Levelling | C | construction dump |
MNO12_1238 | MU - Make-up, Levelling | C | construction dump |