Subgroup Register Text
- Construction of brick drain
Phase
Subgroup Narrative
-
- Construction of brick drain, aligned east-west, with curved base. Impossible to accurately determine fall as levels flat at approx 10.4m OD
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_1369 | S - Structural Cut | C | construction cut for drain |
MNO12_1368 | D - Ditch, Drain, Gully, etc. | C | construction backfill |
MNO12_1365 | D - Ditch, Drain, Gully, etc. | CU | brick drain |