Subgroup Register Text
- Construction of drain
Phase
Subgroup Narrative
-
- Construction and use of brick drain within TP1/GP2. Brick drain with slightly curved base and vertical sides
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_42 | S - Structural Cut | C | construction cut for drain |
MNO12_41 | S - Structural Cut | C | construction backfill |
MNO12_40 | D - Ditch, Drain, Gully, etc. | CU | brick drain or sewer |
MNO12_143 | S - Structural Cut | C | construction cut for drain |
MNO12_142 | S - Structural Cut | C | construction backfill of drain |
MNO12_141 | D - Ditch, Drain, Gully, etc. | CU | brick drain |