Subgroup Register Text
- Drain and chamber
Phase
Subgroup Narrative
-
- Drain and chamber; E-W aligned. Iron drainpipe within trench, leads from brick inspection chamber at west end of trench. Includes repair to Georgian wall.
-
- Chiz Harward
- 27-5-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3393 | S - Structural Cut | C | Cut for drain and chamber |
MNO12_3458 | ME - Mechanical Fixtures/Fittings | CU | Iron pipe running East-west from brick inspection chamber |
MNO12_3409 | SU - Sump - Water Collection Pit | CU | Brick inspection chamber |
MNO12_3385 | D - Ditch, Drain, Gully, etc. | C | backfill of drain cut |
MNO12_3416 | WA - Wall, Sill | CU | Repair to Georgian wall after drain cut had cut through it |