Subgroup Register Text
- Modern drainage system
Phase
Subgroup Narrative
-
- Modern drainage system: Inspection chamber and concrete encased drain. Relaid York Stone and concrete floor surface (10.74m OD) with inset metal drainholes, one with metal grille.
-
- Chiz Harward
- 27-5-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3137 | SU - Sump - Water Collection Pit | CU | Inspection chamber within Georgian brick building at West end of building. |
MNO12_3138 | FL - Floor | CU | Relaid concrete floor surface for drain, at West end of Georgian building. |
MNO12_3139 | FL - Floor | CU | Relaid York stone slabs within Georgian building |
MNO12_3522 | D - Ditch, Drain, Gully, etc. | C | Concrete within modern drain cut [3145]. |
MNO12_3235 | D - Ditch, Drain, Gully, etc. | C | Backfill on top of drains within Georgian building. |
MNO12_3145 | S - Structural Cut | C | Drain cut |