Subgroup Register Text
- Peg tile floor
Phase
Subgroup Narrative
-
- Peg tile floor, peg tiles laid on base of barrel vault forming floor. 8.45-8.54m OD
-
- Chiz Harward
- 7-6-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3090 | MU - Make-up, Levelling | C | Makeup deposit beneath 3087 |