Subgroup Register Text
- Infilling of ponded former quarry pit
Phase
Subgroup Narrative
-
- Infilling of ponded former quarry pit; deposits appear to have been settled out in water, potentially flooded area with dumps into the water? Part of wider final infilling of former quarry site
-
- Chiz Harward
- 8-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_111 | NC - Natural Alluvial Channel Deposit | C | laminated deposit on base of ponded area in infilled quarry pit |
MNO12_110 | PQ - Pit Quarry | D | Lower sandy silt fill of infilled quarry pit |
MNO12_109 | PQ - Pit Quarry | D | Upper backfill of former quarry pit, settling out into water? |