Subgroup Register Text
- Postsetting cut into ditch silts
Phase
Subgroup Narrative
-
- Postsetting cut into ditch silts
-
- Chiz Harward
- 9-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3245 | SP - Structural Cut (Post-hole) | C | Cut of posthole, cuts into ditch silts, angled point down to east (possibly when post pulled out?) |
MNO12_3244 | SP - Structural Cut (Post-hole) | D | Fill of posthole |