Subgroup Register Text
- demolition and clinker dumps into ditch
Phase
Subgroup Narrative
-
- demolition and clinker dumps into ditch in northern hand dig area
-
- Chiz Harward
- 13-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_2829 | ED - External Dump | C | Mixed sandy silt dump, with construction/demolition waste. Slumps from 6.90 to 6.18m OD in west |
MNO12_2831 | ED - External Dump | C | Clinker dump within ditch. Slopes from 6.83 to 6.42m OD in west |