Subgroup Register Text
- External dumping, seals robbed pit
Phase
Subgroup Narrative
-
- Series of external dumps sealing and filling the robbed timber-lined pit
-
- Chiz Harward
- 14-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_2654 | ED - External Dump | C | Flecks sandy deposit |
MNO12_2626 | ED - External Dump | C | Slump deposit in large pit 2625 |
MNO12_2617 | ED - External Dump | C | Clayey silt large pit fill |
MNO12_2616 | ED - External Dump | C | Sandy fill of large pit |
MNO12_2615 | ED - External Dump | C | Fill of large pit |
MNO12_2675 | ED - External Dump | C | Backfill of the northern side of pit 2625 that was machined out and combines all fills that we're excavated stratigraphically on the southern end of the pit and recorded in plan an section. |