Subgroup Register Text
- construction of brick drain
Phase
Subgroup Narrative
-
- Construction of brick drain, aligned N-S, fitted into pre-existing gaps in foundation -evidence of pre-designed drainage system
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_1098 | S - Structural Cut | C | Cut for brick drain |
MNO12_1097 | D - Ditch, Drain, Gully, etc. | CU | Brick drain |
MNO12_1110 | S - Structural Cut | C | Cut of brick drain |
MNO12_1099 | D - Ditch, Drain, Gully, etc. | CU | brick drain |