Subgroup Register Text
- Concrete infilling of brick cellar
Phase
Subgroup Narrative
-
- Concrete infilling of brick barrel vault, associated with construction of District Line; GP1
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_15 | CE - Cellar, Basement, etc. | D | Concrete in filling on brick vault (9) / (14). Possibly this cellar falls out of use and infilled in as part of construction of the District line which runs immediately to the west. |
MNO12_17 | S - Structural Cut | C | Construction cut (?) possibly associated with construction of District line directly to the west. Cut runs N-S, truncating barrel vault (9) / (14). After the top of the vault is truncated by this event it is then back filled with concrete (15). |