Subgroup Register Text
- Rebuild of silt trap/chamber
Phase
Subgroup Narrative
-
- Rebuild of north end of drain chamber or silt trap, with slate and concrete floor. Not excavated as outside of excavation area.
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_267 | D - Ditch, Drain, Gully, etc. | CU | Rebuild of north end of drain chamber or silt trap. Not excavated. |