Subgroup Register Text
- Trench dug through alley-way
Phase
Subgroup Narrative
-
- Pit or trench dug through alleyway; no discernible function, possibly dug against side wall of alley to allow repair or rebuild?
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_280 | SN - Non-Structural Cut | C | cut through alley deposits |
MNO12_279 | SN - Non-Structural Cut | D | Dumped mortary layer in trench through alley |