Subgroup Register Text
- Silt trap
Phase
Subgroup Narrative
-
- Brick silt trap, built as part of main structural walls and serves several properties. Substantial brick structure.
-
- Chiz Harward
- 26-5-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3862 | SU - Sump - Water Collection Pit | CU | Brick walls of silt trap; integral silt trap to main structural walls |
MNO12_3996 | S - Structural Cut | C | Construction Cut for silt trap [3862] |
MNO12_3995 | S - Structural Cut | C | Fill of Construction Cut for Wall [3862] |