Subgroup Register Text
- Silt trap
Phase
Subgroup Narrative
-
- Brick silt trap and drain system. Brick drain running south into brick silt trap. Silt trap has three openings: north, east and south
-
- Chiz Harward
- 27-5-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3959 | S - Structural Cut | C | Cut for Silt Trap [3879] |
MNO12_3879 | SU - Sump - Water Collection Pit | CU | Brick silt trap. |
MNO12_4060 | S - Structural Cut | C | construction cut for drain |
MNO12_4059 | D - Ditch, Drain, Gully, etc. | CU | Drain leading into silt trap |
MNO12_4057 | S - Structural Cut | C | Construction backfill of Drain |