Subgroup Register Text
- Bricks controlling flow into silt trap
Phase
Subgroup Narrative
-
- Brick mortared into place on floor of drain, presumably to control/slow flow of water into silt trap immediately to south?
-
- Chiz Harward
- 27-5-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_4058 | D - Ditch, Drain, Gully, etc. | CU | Brick blocking within drain, part of system to control flow within drain ahead of entry into silt trap |