Subgroup Register Text
- Brick drain
Phase
Subgroup Narrative
-
- Brick drain with tile base and brick and tile roof, parallel brick walls; fall is to west
-
- Chiz Harward
- 7-6-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3473 | S - Structural Cut | C | Construction cut for drain 3413 |
MNO12_3413 | D - Ditch, Drain, Gully, etc. | CU | Brick drain |
MNO12_3412 | D - Ditch, Drain, Gully, etc. | CU | Tile and brick drain cover; PLEASE NOTE: A number wang occurred with this context being recorded as 3421 on the paperwork. ANY POSSIBLE BRICK SAMPLES LABELLED 3421 WILL ACTUALLY BE FOR 3412!!!!! |
MNO12_3632 | D - Ditch, Drain, Gully, etc. | C | Construction backfill for drain 3413 |