Subgroup Register Text
- brick floor
Phase
Subgroup Narrative
-
- brick floor: poorly lain floor of half-bricks, 9.28-9.50m OD
-
- Chiz Harward
- 7-6-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_3185 | S - Structural Cut | C | Construction cut for brick floor 3119 |
MNO12_3135 | MU - Make-up, Levelling | C | Silty deposit beneath 3126 |
MNO12_3126 | MU - Make-up, Levelling | C | Make up layer under brick floor 3119 |
MNO12_3119 | FL - Floor | CU | Brick floor in room South of barrel vault. South of drain. Same as 3118 |