Subgroup Register Text
- rebuild of sleeper walls after drain insertion
Phase
Subgroup Narrative
-
- rebuild of three sleeper walls after drain insertion
-
- Chiz Harward
- 7-6-2016
Subgroup Matrix
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_2262 | PS - Positive Structural (Not Walls) | C | Rebuild of brick sleeper wall for drainpipe |
MNO12_2261 | PS - Positive Structural (Not Walls) | C | Rebuild of brick sleeper wall for drainpipe |
MNO12_2260 | C | Rebuild of brick sleeper wall for drainpipe |