Context Basic Interp. Basic Process Context Description
MNO12_2187
S - Structural Cut
C
Construction cut for drain 2186
MNO12_2186
D - Ditch, Drain, Gully, etc.
CU
Drain pipe in concrete
MNO12_2188
D - Ditch, Drain, Gully, etc.
C
Construction backfill of 2187
MNO12_2255
D - Ditch, Drain, Gully, etc.
C
Concrete pad for drain 2186 north of wall 2036
MNO12_2131
D - Ditch, Drain, Gully, etc.
C
Concrete pad for drain system within wall 2049
MNO12_2132
D - Ditch, Drain, Gully, etc.
C
Concrete pad for drain system within wall 2049 and 2048 west of brick floor 2051
MNO12_2136
PS - Positive Structural (Not Walls)
CU
Grouting surface on Northern face of wall 2048