Subgroup Register Text
- N-S sleeper wall above drain rebuilds
Phase
Subgroup Narrative
-
- N-S sleeper wall above drain rebuilds
-
- Chiz Harward
- 7-6-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_2306 | PS - Positive Structural (Not Walls) | C | N-S sleeper wall in W end of No 1 The Crescent |