Subgroup Register Text
- Levelling deposits, post viaduct
Phase
Subgroup Narrative
-
- Levelling deposits, post viaduct; GP1
-
- Chiz Harward
- 26-2-2016
Contexts
Context | Basic Interp. | Basic Process | Context Description |
---|---|---|---|
MNO12_7 | MU - Make-up, Levelling | CU | Mid 19th century dump deposit. Levelling and ground raising after construction of railway viaduct (14). Top of deposit has 10 mm thick mortar trample surface on it (at interface with 6). This is probably a working surface of trample associated with levelling activity. |
MNO12_6 | MU - Make-up, Levelling | C | Post med dump deposit. Lots of gravel and building debris and cbm. Infilling of large construction cut (10) for construction of railway vault. Mid 19 th century deposit. |